Heroes of the Telegraph
John Munro137It was a gutta-percha cable of six wires or conductors, and manufactured by Messrs. Glass & Elliott, of Greenwich--a firm which afterwards combined with the Gutta-Percha Company, and became the existing Telegraph Construction and Maintenance Company. Mr. Brett laid the cable from the Result, a sailing ship in tow, instead of a more manageable steamer; and, meeting with 600 fathoms of water when twenty-five miles from land, the cable ran out so fast that a tangled skein came up out of the hold, and the line had to be severed. Having only 150 miles on board to span the whole distance of 140 miles, he grappled the lost cable near the shore, raised it, and 'under-run' or passed it over the ship, for some twenty miles, then cut it, leaving the seaward end on the bottom. He then spliced the ship's cable to the shoreward end and resumed his paying-out; but after seventy miles in all were laid, another rapid rush of cable took place, and Mr. Brett was obliged to cut and abandon the line. Another attempt was made the following year, but with no better success. Mr. Brett then tried to lay a three-wire cable from the steamer Dutchman, but owing to the deep water--in some places 1500 fathoms--its egress was so rapid, that when he came to a few miles from Galita, his destination on the Algerian coast, he had not enough cable to reach the land. He therefore telegraphed to London for more cable to be made and sent out, while the ship remained there holding to the end. For five days he succeeded in doing so, sending and receiving messages; but heavy weather came on, and the cable parted, having, it is said, been chafed through by rubbing on the bottom. After that Mr. Brett went home.

